3H New Factory Phase II: Beam Raising & Topping Out Ceremonies Held Successfully! In June, marked a pivotal milestone for 3H New Factory (also known as 3H Smart Factory) Phase II construction: the Beam Raising Ceremony for Plant I and the Topping Out Ceremony for Dormitory Building A were triumpha
3H New Factory Phase II: Beam Raising & Topping Out Ceremonies Held Successfully! In June, marked a pivotal milestone for 3H New Factory (also known as 3H Smart Factory) Phase II construction: the Beam Raising Ceremony for Plant I and the Topping Out Ceremony for Dormitory Building A were triumpha
3H New Factory Phase II: Beam Raising & Topping Out Ceremonies Held Successfully! In June, marked a pivotal milestone for 3H New Factory (also known as 3H Smart Factory) Phase II construction: the Beam Raising Ceremony for Plant I and the Topping Out Ceremony for Dormitory Building A were triumpha
<p>3H New Factory Phase II: Beam Raising & Topping Out Ceremonies Held Successfully! In June, marked a pivotal milestone for 3H New Factory (also known as 3H Smart Factory) Phase II construction: the Beam Raising Ceremony for Plant I and the Topping Out Ceremony for Dormitory Building A were triumpha</p>
3H New Factory Phase II: Beam Raising & Topping Out Ceremonies Held Successfully! In June, marked a pivotal milestone for 3H New Factory (also known as 3H Smart Factory) Phase II construction: the Beam Raising Ceremony for Plant I and the Topping Out Ceremony for Dormitory Building A were triumpha
CZ11A
3H INC.
Product Description
Item No. | CZ11A |
Size | 159.5*18*56mm |
Application | casement window |
Length of shaft | Optional |
Material | aluminum alloy |
Surface Treatment | Powder coating |
Color | Optional |
Components | shaft,cover |
Function | durable,easy-installation,smooth-operation |
Package | Box |
Specification
Product Description
1. Without left or right version
2. The length of shaft can be customized
Key Points for Handle Installation
Decide the correct position and size of the shaft and screw holes according to the selected handle and other items.
After the position is decided,drill for screw and square shaft on profile according to the handle.
The handle must operate freely on the profile.
The installation position must be aligned with its matching transmission device,non-interference or deflective.
Note:Different handle matches different transmission devices and profiles,there is a difference on the position
and the size of the punching hole.Please contact us when it is necessary.